A new 142-Tesla Megapack project has been turned on in California’s  Ventura County to create a giant new battery that is replacing a gas  peaker plant.
 The project is called the Saticoy battery storage system, and it came  about when the local community in Oxnard fought against having a new  gas-powered peaker plant to help respond to the energy demand during  peak times.   Instead, they settled on a proposal from Arevon Asset Management  (Arevon), a renewable energy company, to deploy a massive 100  megawatt/400 megawatt-hour battery system to help power the peak energy  demand.
Read Article